Skip to content

Manufacturing

The line already knows who released the work. The system usually does not.

The same confirm-and-sign pattern as finance, on the floor: who confirmed the work-order gate, who signed the first piece or the scrap disposition — beside the manufacturing system, not a replacement for ERP.

Request a walkthrough

Where it fails

  1. 01

    Release authority is tribal. A new supervisor invents a local gate.

  2. 02

    First-piece sign-off lives on paper or in a photo in chat.

  3. 03

    Engineering changes land in email. The floor finds out at the first piece.

  4. 04

    The record of who confirmed a deviation is a binder nobody trusts.

3S applied

Systemize

Capture the real route: stations, confirm gates, who can release a work order, and what evidence closes it.

Standardize

One standard procedure per operation, versioned, with confirm states that mean the same thing on every line.

Synchronize

Keep item, bill of materials, and resource codes aligned so a work order in ERP is the same work order on the tower.

Layers in play

Cutover

Start with one line and one process family, for example assembly plus first-piece sign-off. Keep the paper path as fallback for a named window. Stabilize the queues, then take the next line.

Request a walkthrough